![]() |
|
HomeBack Issue ArchivesReader ResourcesSubscriptionsAdvertisingReader FeedbackAbout MSC |
||||
January 2007
Articles
Above and Around By William F. O'Donnell, P.E., Ronald A. Peron, P.E, S.E., and Paul E. Fulton, P.E. Jewish Hospital in downtown Louisville overcame expansion challenges by building above and around its existing rehabilitation facilty. (262 KB) Bridging the Past By Joe Deneault, P.E. The Blennerhassett Bridge completes a strategic West Virginia corridor - using 30 million pounds of high-performance steel. (136 KB) Form and Function By Geoff Weisenberger Manitou Springs, Colorado's new Shared Integrated Learning Center uses steel to create an aesthetic structure for this artsoriented mountain community. (191 KB) SteelWise: Prequalified Seismic Moment Connections By Gregory Kochalski and Jason Ericksen, S.E. Here's a visual summary of the seismic requirements for two prequalified moment connections. (154 KB) Quality Corner: Internal Audits: Making Them Happen - Part 2: Action By Pat Thomashefsky After the preparation stage, it's time for the audit itself. Here are some suggestions on performing your internal audit and addressing the results. Shear Strength By Anne B. Monnier, P.E. and Anthony P Harasimowicz, P.E. Steel plate shear walls made this hospital expansion possible. (187 KB) |
![]() ![]() ![]() |
|||||
|
© 2013 Modern Steel Construction. All Rights Reserved American Institute of Steel Construction • One East Wacker Dr., Suite 700 Chicago, IL 60601 |
||||||